Devi Dass v. Tula Ram
Case brief
What is this about?
Devi Dass v Tula Ram; CMPMO No. 502 of 2025; High Court of Himachal Pradesh at Shimla; decided 27.08.2025 by Justice Ajay Mohan Goel; application under Order XXXIX Rules 1 and 2 CPC dismissed by Trial Court (02.07.2025) and confirmed by Appellate Court (21.08.2025); co-sharer construction over joint land; petitioner himself built two-storey structure and raised no objection; findings not shown perverse; constructions not in excess of share; petition disposed of without interference; construction at respondent's own risk and peril; no equity claimable by respondent if plaintiff succeeds in suit.
What did the court decide?
No interim relief; petition disposed of without interfering with the orders below, with the observation that the respondent's construction shall be at his own risk and peril and that no equity shall be claimable by the respondent if the petitioner succeeds in the suit.