Skyline Engineering Contracts (India) Private Limited v. Orchid Infrastructure Developers Private Limited
Case brief
What is this about?
Petition under Section 29A of the Arbitration and Conciliation Act, 1996 sought extension of the Sole Arbitrator's mandate by twelve months in ongoing arbitration over a 2010 contract. The Respondent raised no objection. With parties' consent, the mandate was extended six months from 08.08.2025, the intervening period was regularized, and the Arbitrator was requested to conclude proceedings expedi
What did the court decide?
Mandate of Sole Arbitrator extended by 06 months from 08.08.2025; period between 01.04.2025 and 07.08.2025 regularized; Arbitrator to expedite proceedings.