NTPC Limited v. M/S Patel Engineering
Case brief
What is this about?
A construction arbitration concerned compensation following suspension and discontinuation of a hydroelectric project. The Court set aside only pre-award interest as contractually prohibited, leaving the remaining award undisturbed. Challenges concerning the scope of claims, insurance, arbitration costs and machinery deterioration were rejected.
What did the court decide?
The arbitral award was set aside only to the extent it granted interest for the period before the date of the award.