Partha Sarkar v. State of West Bengal and Ors.
Case brief
What is this about?
Electric connection writ petition; WBSEDCL meter installed via Ghosh Electric work order (report dated July 17, 2025); private respondent obstructed connection from main switch kept under lock and key; petitioner permitted to take connection from main switch with electrician; restraint on private respondent; police protection from concerned police station on obstruction; breaking open lock in presence of police and new lock/key handed to private respondent; Regulation 14 Sub-Regulation 7.2 relied upon (consumer owns and maintains service line between main switch and meter); WPA 22421 of 2025; Krishna Rao, J.; 03.11.2025; disposed of.
What did the court decide?
Direction permitting the petitioner to take electric connection from the main switch of the meter installed by WBSEDCL with the help of an electrician; the private respondent restrained from obstructing; failing which, the concerned police station to provide police protection, including breaking open any lock in the presence of police and fitting a new lock whose key is handed to the private respondent.