Yadav Nagar Sra Chs through Its Chief Promoter Madhukar Jyoti Belekar v. the Assistant Municipal Commissioner G/South Ward and 2 Ors.
Case brief
What is this about?
Slum rehabilitation; Annexure-II; SRA; BMC Mumbai; Yadav Nagar SRA CHS; 221 vs 63 huts; biometric survey 18.07.2017; videography; demolition of 158 structures for transit camp; eligibility verification; fresh draft Annexure-II 19.05.2018; cancellation and reverification 20.03.2019; site inspection 05.06.2021; Article 226 writ dismissed; G/South Ward; Assistant Municipal Commissioner; Colony Officer affidavits (Mahendra Pawar 20.07.2022; Sameer Tambe 23.10.2024).
What did the court decide?
The Petitioners failed to establish the basis on which their huts were demolished for the transit camp. ¶28