Case brief
What is this about?
The Appellate Tribunal allowed an appeal challenging the State Electricity Regulatory Commission's determination of retail tariffs. The Tribunal held that mandatory Voltage-wise Cost of Supply calculations were ignored unlawfully and directed the Commission to apply a specified methodology and monitor a mandated study.
What did the court decide?
The impugned order determining tariff on Average Cost of Supply was set aside; the State Commission directed to determine tariff based on Voltage-wise Cost of Supply per the Tata Steel case methodolog